Yet
another project stolen from Rob Hoffman's SUNDOG....
While
visiting SUNDOG, I took lots of pictures of the aluminum arch
and then gave them to a local guy to make an "exact
duplicate", I told him.
Here
is the result.
The
dome light platform is a little off center.
Also,
the whole assembly was about 1/4 inch short width-wise.
This
doesn's sound like much, but it was a bear to get the holes
to line up, then "stretch"
the aluminum frame to meet the sides of the cockpit coamings.
I hope it is the aluminum that stretches and that my Gemini
doesn't look like this in a few years!!!
The
support is really good for hanging onto in a rough seaway. There
is a double tube up at the top with a spacer an this makes a
really good handhold. I feel much better about lashing the boom
down to the dodger now, also.
I
ran a wire from the dome light platform, down through the tube,
into the aft port berth and over the already crowded electrical
panel for yet another light.